This new 148,000 SF replacement critical access hospital is on a greenfield site on the south side of Tomah, Wisconsin, and is part of Tomah Health’s new campus.
The three-story aesthetically appealing building features a glass-walled, two-story entry atrium. The urgent care/emergency department has 12 treatment rooms and a two-bay ambulance garage, the surgery area has two procedure rooms and four operating rooms, and the OB/birthing suites come complete with water birthing tubs.
Additional spaces include a primary and specialty care clinic with eight exam rooms, an imaging suite, a rehabilitation area with a hydrotherapy pool, a cafeteria, and infusion, lab, pharmacy, administration, and support spaces.
Construction Manager
- Owner: Tomah Health
- Architect: BWBR Architects
- Size: 148,000 sq. ft.
- Start Date: July 2017
- Completion Date: July 2019